՞
Toyota Yerevan also decided to switch to solar energy and go green with Solar AM LLC. As a result of our cooperation, this 100 kW solar station was installed, for the construction of which 198 sets of 545W panels were used. (manufactured in 2023 by the Risen Energy Co.)
One 100kW three-phase inverter manufactured by Huawei was also used for the project.
Repair and monitoring works
We systematically monitor plant performance and collect data for analysis and reporting. It provides an opportunity to carry out high-quality warranty service of stations and analysis of detected technical problems and provision of effective solutions in a short period of time.